Prior to setting the unit onto the curb the installer should ensure that a sealing material is positioned between the unit and the curb to provide a watertight connection.
How to set a roof curb.
Pressure treated nailers should be provided by the curb manufacturer to receive roofing felts and eliminate noise transfer.
Roofi ng may be completed after setting the unit.
Roof curbs are in many cases installed on the roof and temporarily covered over for waterproofing purposes much earlier than the construction schedule requires.
Roof curbs allow the installation of the primary roof and the flashings around this roof curb prior to the delivery of the actual roof equipment and the setting of this equipment.
Curbs should be a minimum of eight inches above the finished roof and factory insulated to reduce condensation.
Curb installation should be a part of the roof deck not on top of insulation or roofing materials.
The rooftop unit may be mounted immediately after the curb is installed.
Prefabricated roof curbs have been in use since the roof has been utilized for something other than keeping weather out.
Because the roof is slightly slanted one side of the curb had to leveled with boards.
The primary function of the curb is to keep weather out while supporting flashing the equipment on it.
Specify prefabricated roof curbs and related products by a roof curb manufacturer not with or by the equipment manufacturer.
The opening through the metal roof was for the intake duct to the a c unit.
After leveling the curb we anchored the curb down with 4 screws to the metal sub roof.