Make sure that the tab of the shingle in the second course will cover it completely.
How to shingle peak roof.
Measure down 6 inches from the center of the roof ridge and chalk a line parallel with the ridge.
Capping a roof is the last thing done during a roofing project.
Butt the edge of the first cap shingle along this line.
This nailing area is right where you see the dabs of black asphalt cement that are just above the tab knockouts.
Nailing the cap.
Hammer a roofing nail on each side of the shingle five inches from the bottom edges and one inch from the side edge.
Secure the horizontal flange to the roof.
It must be completed at the very end.
Secure the last ridge cap shingle with four nails at the corners of the shingle and cover the nail heads with roofing cement.
The cap must be positioned to minimize wind and weather damage after it has been nailed down.
Overlap the shingles to cover the nails on the side edges and use roofing cement to cover the nail heads on the shingle at the end of the roof.
How to shingle a roof 90 pics pro tips recommendations step 1.
You can either use special shingles called ridge shingles or cut a number of regular shingles into 3 tabbed equal pieces and bend each so they fit snugly on the roof peak and nail them into place.
Remove existing roof and underlayment.
Remove old shingles and.
It generally takes three bundles of shingles to cover 100 square feet.
Get the right number of shingles for the job.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
Preparing the roof 1.
This will help determine how the shingles will lay on the.
Cut and bend a shingle to conform to the shape of the peak of the roof.
Place the second step flashing piece over the end shingle in the first course by positioning it 143 mm 5 5 8 above the bottom edge of the exposed asphalt shingle.
Many pros shingle in a vertical line up the roof because it s much faster.
Use a roofing nail 1 to tack the drip edge down one every 10 when placing two pieces of drip edge together overlap one end over the other by 1 and secure using two roofing nails one in the back and one in the front.
If your eave is one straight length then pick an end and work to the other.
Put in one 2 inch long nail back 6 inches from the edge of the cap shingle.
Lay the last ridge cap shingle in the center of the shed roof on top of the exposed adhesive portions of the two center ridge cap shingles.
Measure the length of a shingle as it lies across the roof.
The original plan was to preserve a portion of the existing roof since.
Positioning of the cap.