It was actually kind of a random thing.
Installing shower stall door.
Drill proper holes into the walls for the side rails.
However the actual installation of your new shower door can be completed by our professional installers in 2 3 hours.
Set the base track.
Measure the length of the shower threshold then use a hacksaw to cut the aluminum base.
Fill in all the measurements and take it with you to the showroom.
How to install a shower or tub door measuring and cutting the tracks.
Cut the base track to length.
Tap a plastic anchor into the pre drilled holes in the tile image 3.
How to install a frameless shower door.
The interior door goes in first and then the exterior door is installed from the bottom up.
Install the handles and the rubber stoppers image 2.
Place end caps on the tops of the wall channels.
Locating the bottom track.
Our shower doors are customized for your space so having a new one ordered fabricated and delivered could take up to 3 weeks.
Towel off the wet frame before adding more sealant and allow the sealant to cure completely prior to your next test.
Attach the door handles and any towel bars.
You install the bottom track on the top edge of the shower base or tub.
In this video i show installing a frameless shower door enclosure.
Once everything is screwed and snapped into place the roller wheels go on the doors and the doors themselves are lifted into place image 1.
Run a bead of silicone on the underside of the threshold piece image 1.
How to install a basic sliding tub shower door.
Place the glass clamp sweep into place on the door s bottom edge and secure it at the door clamp.
Attach the seal strip to the bottom of the door and cut it to the required length.
How to install a shower door shower door overview.
Click enlarge this image to.
How to install a basic sliding tub shower door.
If water is escaping between the door and base track consider attaching a separate drip tray to catch and redirect what.
Shower door kits will come with a set of metal tracks that seat the shower door so most of the assembly process involves installing the metal frame.
The top and bottom tracks supplied by the manufacturer must be cut slightly shorter.