From an inside corner on a wall where you wish to start installing 4 foot wide panels.
Installing white hardboard wall panel.
After attaching the panel to the center stud insert additional nails through all remaining studs in the same manner.
For best results set the paneling in the room for a few days before you install it.
Measure the height of the wall where you plan to install the hardboard panels using a tape measure.
Thick x 4 ft.
Use a stud sensor to locate and mark the wall framing.
Place the first hardboard panel up to the corner of the wall and locate a wall stud in the center of it.
This will allow it to adjust to the humidity in a room.
If the corner isn t straight and plumb you ll see gaps.
It is not intended for use in a high moisture area like a shower or bathtub surround.
How to install tempered hardboard panels to walls.
Stack the hardboard panels in the room where you plan to install them and leave them for 48 hours to allow them to acclimate.
Tack a full panel in place with one long edge aligned with the plumb mark then check to see how the opposite edge fits into the corner.
Installation is done using a high grade panel or construction trowel on adhesive.
Panel should end and begin on a stud.
Measure mark and cut the beadboard.
With our markerboard and frost white panels you can add a functional wall to draw and color on such as in workshops and playrooms.
Thrifty white panelboard is 1 8 in.
Gently remove any crown moulding baseboards and trim you plan on using again.
In a conventionally framed room with wall studs 16 on center each 4x8 ft.
Insert 3 4 inch nails through the stud spacing them every 8 inches.
Step 1 move the hardboard panels into the installation room and lean them up against the wall with the backs facing outward toward the room.
When installing hardboard on the ceiling secure it firmly to the joists to prevent sagging.
For other options like our thrifty white smooth paneling you can quickly brighten up utility and laundry rooms.
Plan the installation to start at a left side corner and work outward across the wall to the right.
Using a level mark a plumb line 48 in.
Leave the panels in this location for a minimum of 48 hours before installation to allow them to acclimate.
This is the.